Question
Download Solution PDFA and B alone can do a piece of work in 4 and 9 days, respectively. In how many days will the work be completed, if they both work on alternate days, starting with B?
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFGiven:
A can do a piece of work = 4 days
B can do a piece of work = 9 days
Formula used:
Total work = efficiency × time
Calculation:
Efficiency | Person | Time | Total work |
9 | A | 4 | 36 |
4 | B | 9 |
Now,
(B + A) = 4 + 9 = 13 units = 2 days
⇒ (13 × 2) = 26 units = (2 × 2) = 4 days
⇒ 30 units = 5 days
⇒ 36 units = 5 + (6/9) = 5
∴ The correct answer is 5
Last updated on Jul 22, 2025
-> The IB Security Assistant Executive Notification 2025 has been released on 22nd July 2025 on the official website.
-> The SSC CGL Notification 2025 has been announced for 14,582 vacancies of various Group B and C posts across central government departments.
-> The SSC CGL Tier 1 exam is scheduled to take place from 13th to 30th August 2025 in multiple shifts.
-> In the SSC CGL 2025 Notification, vacancies for two new posts, namely, "Section Head" and "Office Superintendent" have been announced.
-> Candidates can refer to the CGL Syllabus for a better understanding of the exam structure and pattern.
-> The CGL Eligibility is a bachelor’s degree in any discipline, with the age limit varying from post to post.
-> The SSC CGL Salary structure varies by post, with entry-level posts starting at Pay Level-4 (Rs. 25,500 to 81,100/-) and going up to Pay Level-7 (Rs. 44,900 to 1,42,400/-).
-> Attempt SSC CGL Free English Mock Test and SSC CGL Current Affairs Mock Test.